Bid Classification: 
Services
Bid Type:  RFP/NRFP
Bid Number:  P22-007
Bid Name:  Engineering Services – Boundary Road Reservoir Development
Bid Status:  Awarded
Bid Awarded Date:  Wed Mar 23, 2022 (PDT)
Published Date:  Thu Jan 13, 2022 4:00:00 PM (PST)
Bid Closing Date:  Thu Feb 17, 2022 2:00:00 PM (PST)
Question Deadline:  Tue Feb 1, 2022 5:00:00 PM (PST)
Time-frame for delivery or the duration of the contract:  Refer to project document
Negotiation Type:  Refer to project document
Condition for Participation:  Refer to project document
Electronic Auctions:  Not Applicable
Language for Bid Submissions:  English unless specified in the bid document
Submission Type:  Online Submissions Only
Submission Address:  Online Submissions Only
Public Opening:  No
Description: 

The City of Prince George (City) is seeking the services of a qualified engineering consulting firm with the appropriate team of specialists who can demonstrate the experience required to initially provide an innovative and cost effective predesign study directly related to a new water reservoir along Boundary Road. The new reservoir is required to improve fire flows to the industrial area south of the watermain high point along Boundary Road. The deliverables of the predesign study will be a preliminary design complete with class “C” cost estimates to inform the next stage, namely detailed design.  The City intends to expand the scope of work to the detailed design and further to construction services which includes contract administration and project closeout services, pending consultant performance and project approvals at each of the first two stages. This RFP is for the predesign stage at this time only Phase 1 only, with potential to move to Phases 2 and 3 the design and construction stages respectively, pending consultant performance, project pricing, and ultimately budget approval.

 

The services required for Phase 1 the predesign stage include but are not limited to:

 

  1. Review and Investigation of existing infrastructure and environment;
  2. Assess future fire flow requirements;
  3. Conduct an investigation to identify the most suitable site and area required to construct and access the proposed new reservoir complete with evaluation of site conditions and physical limitations;
  4. Develop a technical analysis of potential reservoir design options to review with the City project team;
  5. Determine land acquisition requirements;
  6. Work with the City project team to determine a preferred design option;
  7. Complete a preliminary design report based on the preferred design option;
  8. Complete preliminary design drawings;
  9. Complete land acquisition drawing;
  10. Complete Class C Capital Cost Estimate;
  11. Provide proposal and estimate for Phase 2 – Detailed Design.
  1.  
  2.  

High-Level Milestone

Date

Phase 1 – Preliminary Design and Cost EstimateMarch 2022 – June 2022
*Phase 2 – Detailed Design and Cost EstimateJune 2022 – January 2023
*Phase 3 – Construction and CloseoutJanuary 2023 – August 2023

            *Phases 2 & 3 are pending Supplier performance and project budget approval

  1. and access the proposed new reservoir complete with evaluation of site conditions and physical limitations;
  2. Develop a technical analysis of potential reservoir design options to review with the City project team;
  3. Determine land acquisition requirements;
  4. Work with the City project team to determine a preferred design option;
  5. Complete a preliminary design report based on the preferred design option;
  6. Complete preliminary design drawings;
  7. Complete land acquisition drawing;
  8. Complete Class C Capital Cost Estimate;
  9. Provide proposal and estimate for Phase 2 – Detailed Design.
  1.  
  2.  

High-Level Milestone

Date

Phase 1 – Preliminary Design and Cost EstimateMarch 2022 – June 2022
*Phase 2 – Detailed Design and Cost EstimateJune 2022 – January 2023
*Phase 3 – Construction and CloseoutJanuary 2023 – August 2023

            *Phases 2 & 3 are pending Supplier performance and project budget approval

This solicitation may lead to sequential or concurrent negotiations with one or more Proponents offering the most advantageous proposal(s), or to the creation of a Contract without negotiations.

Bid Document Access:  Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation.
Trade Agreement Description:  Show Trade Agreement Description [+]
NWPTA
CFTA
Categories:  Show Categories [+]
  • Consulting Services - Professional Services
    • Engineering

Meeting Locations

The following are the meeting times and locations for the bid:


This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.

Awarded

The following are the awarded vendors for the bid:

​No Awarded Vendors

Bids Submitted

The following are the unofficial bid results

No submitted bids
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.